What Is…
1) Power Supply. Should be done within the next week or so.
2) Visual effects for big project. Just got the approval I needed that my idea should work as planned. Going to do a small scale test in the next and make sure I don’t blow any fuses 🙂
3) Time running out on getting this out when I wanted to.
What Needs To Be…
1) Finish music. Not a huge deal, but is a huge deal. Have first part rough done. Still need to figure out ending.
2) Motors and things. Havent even started on this yet.
3) Costume design. Well I should say costume alteration design. Somehow this looks like it will be easier than the visual effects.
4) More time in the day, week, or month. If there was a day or two between Monday and Tuesday, that would be helpful.